 - Sirdarya 1,500MW combined-cycle gas turbine (CCGT) Power Plant
 
Sirdarya 1,500MW combined-cycle gas turbine (CCGT) Power Plant
Uzbekistan
| Borrower | ACWA Power Sirdarya LLC | 
| Financing Type | Private Sector & Trade Finance | 
| Instrument | Private Sector Debt | 
| Focus Area | Energy | 
| Approved | 25.02.2021 | 
| Signed | 02.03.2021 | 
| Status | Completed | 
| Loan Administrator | OPEC Fund | 
| Co-financiers | EBRD, DEG, SCB, AIIB, NSA, SOCIETE, BOC, China Construction , Sirdarya | 
| OPEC Fund Contribution (US$m) | 50.00 | 
The loan agreement with ACWA Power to support the construction and operation of a 1.5 GW combined cycle gas-turbine power plant in Sirdarya, Uzbekistan. The new plant, located near the border with Tajikistan, will replace an ageing, less efficient thermal power facility, resulting in lower operating costs and a significant reduction in GHG emissions.