We use Cookies. Read our Terms
- Operations
- Sidi Cheho Al Massira Hydropower Project
Sidi Cheho Al Massira Hydropower Project
Morocco
| Borrower | Morocco |
| Financing Type | Public Sector |
| Instrument | Project Loan |
| Focus Area | Energy |
| Approved | 02.08.1977 |
| Signed | 06.10.1977 |
| Status | Completed |
| Loan Administrator | IBRD |
| Executing Agency | Office National de l'Electricité |
| Co-financiers | IBRD |
| OPEC Fund Contribution (US$m) | 3.00 |
| Total Project Cost (US$m) | 167.10 |
The project sought to contribute to the rational development of water resources in the Oum-er-R'bia basin and to meeting the growing demand for electric power, industrial and potable water and water for irrigation development through the construction of: (a) the Al-Massira dam at Sidi Cheho; (b) a 120 MW power station with an adjacent 225 kV substation; (c) about 200 km of 225 kV transmission lines; and through the preparation of preliminary designs and bid documents for the Merifa dam and power station.