Borrower | Honduras |
Financing Type | Public Sector |
Instrument | Project Loan |
Focus Area | Energy |
Approved | 02.08.1977 |
Signed | 07.10.1977 |
Status | Completed |
Loan Administrator | IBRD |
Executing Agency | Empresa Nacional de Energia Electrica (ENEE) |
Co-financiers | IBRD, Government |
OPEC Fund Contribution (US$m) | 1.70 |
Total Project Cost (US$m) | 17.60 |
The project consists of the following components:
- Generation: construction of a generating plant of about 24MV, including associated structure, transformers, transmission lines and supervisory control equipment;
- Interconnection: Construction of 150 km transmission line to the border between Honduras and Nicaragua;
- Extension to New Areas: Construction of 150 km transmission lines;
- conclusion of feasibility studies for El Cajon Hydroelectric Project;
- survey and inventory of the potential hydroelectric and geothermal resources of the two countries; and
- provision of training for the technical personnel working on the project.