- Xai-Xai Bridge Rehabilitation Project
Xai-Xai Bridge Rehabilitation Project
Mozambique
| Borrower | Mozambique |
| Financing Type | Public Sector |
| Instrument | Project Loan |
| Focus Area | Transportation |
| Approved | 06.12.1989 |
| Signed | 15.01.1990 |
| Status | Completed |
| Loan Administrator | OPEC Fund |
| Executing Agency | National Directorate of Roads & Bridges |
| Co-financiers | Government |
| OPEC Fund Contribution (US$m) | 3.50 |
| Total Project Cost (US$m) | 4.42 |
The project will carry out the following:
- reconstruction of the collapsed 40 m central span section of the Xai-Xai Bridge;
- construction of a new steel structure tower to replace the collapsed tower;
- replacement of the concrete deck on top of the metallic structure by a steel sheet deck;
- replacement of steel cables; and
- construction of new pavement on the carriageway and sidewalks.