Xai-Xai Bridge Rehabilitation Project
Mozambique
Borrower | Mozambique |
Financing Type | Public Sector |
Instrument | Project Loan |
Focus Area | Transportation |
Approved | 06.12.1989 |
Signed | 15.01.1990 |
Status | Completed |
Loan Administrator | OPEC Fund |
Executing Agency | National Directorate of Roads & Bridges |
Co-financiers | Government |
OPEC Fund Contribution (US$m) | 3.50 |
Total Project Cost (US$m) | 4.42 |
The project will carry out the following:
- reconstruction of the collapsed 40 m central span section of the Xai-Xai Bridge;
- construction of a new steel structure tower to replace the collapsed tower;
- replacement of the concrete deck on top of the metallic structure by a steel sheet deck;
- replacement of steel cables; and
- construction of new pavement on the carriageway and sidewalks.