We use Cookies. Read our Terms
- Operations
- Volta River Authority Systems Project
Volta River Authority Systems Project
Ghana
Borrower | Ghana |
Financing Type | Public Sector |
Instrument | Project Loan |
Focus Area | Energy |
Approved | 27.03.1980 |
Signed | 18.07.1980 |
Status | Completed |
Loan Administrator | IBRD |
Executing Agency | Volta River Authority |
OPEC Fund Contribution (US$m) | 6.00 |
Total Project Cost (US$m) | 6.00 |
The Volta River Authority Systems Improvement package consists of the following major components:
- power line carrier communication equipment;
- spare step-up transformer for Akosombo;
- radio-communication and other equipment; and
- training.