Volta River Authority Systems Project
Ghana
| Borrower | Ghana |
| Financing Type | Public Sector |
| Instrument | Project Loan |
| Focus Area | Energy |
| Approved | 27.03.1980 |
| Signed | 18.07.1980 |
| Status | Completed |
| Loan Administrator | IBRD |
| Executing Agency | Volta River Authority |
| OPEC Fund Contribution (US$m) | 6.00 |
| Total Project Cost (US$m) | 6.00 |
The Volta River Authority Systems Improvement package consists of the following major components:
- power line carrier communication equipment;
- spare step-up transformer for Akosombo;
- radio-communication and other equipment; and
- training.