Singida Water Supply Project
Tanzania
| Borrower | Tanzania |
| Financing Type | Public Sector |
| Instrument | Project Loan |
| Focus Area | Water & Sanitation |
| Approved | 12.06.2002 |
| Signed | 30.05.2003 |
| Status | Completed |
| Loan Administrator | BADEA |
| Executing Agency | Singida Urban Water Supply and Sewerage Authority, SUWSSA |
| Co-financiers | BADEA, Government |
| OPEC Fund Contribution (US$m) | 5.00 |
| Total Project Cost (US$m) | 12.43 |
Under the project, the following works will be carried out:
- dredging and enlargement of the Itampka Lake;
- construction of a 4,500 m3-capacity treatment plant built;
- construction of a 16 km-long pipeline that will bring water from the Itampka Lake to the city’s Mawanga Water Storage Center;
- rehabilitation of existing storage tanks and building of new ones;
- construction of a water tower near the Singida Airport;
- installation of a 156 km-long water distribution network within Singida, as well as an extensive conveyance system to household connections.