Sevare-Gao Road Rehabilitation Project (Addition Loan)
Mali
Borrower | Mali |
Financing Type | Public Sector |
Instrument | Project Loan |
Focus Area | Transportation |
Approved | 19.03.1990 |
Signed | 20.07.1990 |
Status | Completed |
Loan Administrator | ISDB |
Executing Agency | Ministry of Transport and Public Works |
Co-financiers | ABUDF, KFAED, SFD |
OPEC Fund Contribution (US$m) | 0.50 |
Total Project Cost (US$m) | 4.50 |
Rehabilitation on the Sevare-Gao Road. The project consists of the construction of a 6 m wide bituminous paved road between Sevare and Gao. The total length of the road is 556 km divided into 2 sections: Sevare-Hombori (329 km) and Hombori-Gao (228 km).