Sevare-Gao Road Project
Mali
Borrower | Mali |
Financing Type | Public Sector |
Instrument | Project Loan |
Focus Area | Transportation |
Approved | 25.06.1979 |
Signed | 27.07.1979 |
Status | Completed |
Loan Administrator | ISDB |
Executing Agency | Direction Nationale de l'Infrastructure des Transports, Ministry of Transport and Public Works |
Co-financiers | ISDB, KfW, Government |
OPEC Fund Contribution (US$m) | 7.00 |
Total Project Cost (US$m) | 51.09 |
The project consists of the construction of a 6m wide bituminous paved road between Sevare and Gao. The total length of the road is 556 km divided into two sections, Sevare-Hombori (328 km) and Hombori-Gao (228 km). The project also includes a supervision component.