- Reconstruction of Bishkek-Torugart Road Project
Reconstruction of Bishkek-Torugart Road Project
Kyrgyz Republic
| Borrower | Kyrgyz Republic |
| Financing Type | Public Sector |
| Instrument | Project Loan |
| Focus Area | Transportation |
| Approved | 16.03.2010 |
| Signed | 09.06.2011 |
| Status | Completed |
| Loan Administrator | ISDB |
| Executing Agency | Ministry of Transport and Communication (MOTC) |
| Co-financiers | ADFD, KFAED, ISDB, SFD, Government |
| OPEC Fund Contribution (US$m) | 7.40 |
| Total Project Cost (US$m) | 69.25 |
The 93 km-long Dolon Pass – Char Pass section of the Bishkek – Torugart Road, has deteriorated in parts as a result of overloaded vehicles and severe weather conditions, as well as inadequate maintenance. The project will therefore:
- realign and reconstruct the road section in order to accommodate heavier vehicles and improve drivers’ visibility;
- carrying out of flood protection measures, such as construction of ditches, concrete pipes and culverts;
- installation of traffic and road safety devices installed;
- procurement of maintenance equipment.