Ole-Kengeja Road Project
Tanzania
| Borrower | Tanzania |
| Financing Type | Public Sector |
| Instrument | Project Loan |
| Focus Area | Transportation |
| Approved | 04.12.2007 |
| Signed | 12.04.2008 |
| Status | Completed |
| Loan Administrator | OPEC Fund |
| Executing Agency | Ministry of Communications and Transport, Zanzibar |
| Co-financiers | Government |
| OPEC Fund Contribution (US$m) | 11.00 |
| Total Project Cost (US$m) | 12.78 |
The 35 km-long Ole–Kengeja Road is located on Pemba Island and is situated near high-producing agricultural areas. Serving around 88,000 people, it provides villagers with a principal link for moving produce and accessing social services. The stretch has become so eroded that sections are impassable during the rainy season, bringing income-generating activities to a halt.
The project will upgrade the gravel road to asphalt standard and install drainage structures and concrete culverts to insure year-round travel. Environmental protection measures, such as re-vegetating slopes, will also be put into place in the project area to reduce erosion and prevent landslides.