Mindanao Power Transmission Project
Philippines
| Borrower | Philippines |
| Financing Type | Public Sector |
| Instrument | Project Loan |
| Focus Area | Energy |
| Approved | 30.03.1994 |
| Signed | 07.10.1994 |
| Status | Completed |
| Loan Administrator | ADB |
| Executing Agency | National Power Corporation |
| Co-financiers | Government, ADB |
| OPEC Fund Contribution (US$m) | 6.00 |
| Total Project Cost (US$m) | 22.50 |
The project centers on the construction of a 140 km of 69 kV transmission line and the expansion of five sub - stations. The Mindanao transmission line component is necessitated by 2x50 MW power barge diesel and 2x30 MW power- barge- gas turbines moored in Nasipit in Mindanao which are scheduled to be commissioned in stages beginning in 1994 . Other components covered by the proposed Project include Computer Enhanced Engineering for computer aided planning and design; and Demand-Side Management for rational and efficient use of energy in various sectors of the economy through improved conservation practices, reduction in electricity losses and tariff restructuring.