Mahaweli Power Transmission Project
Sri Lanka
Borrower | Sri Lanka |
Financing Type | Public Sector |
Instrument | Project Loan |
Focus Area | Energy |
Approved | 27.11.1981 |
Signed | 12.01.1982 |
Status | Completed |
Loan Administrator | IDA |
Executing Agency | Ceylon Electricity Board (CEB) |
Co-financiers | IDA, Government |
OPEC Fund Contribution (US$m) | 11.00 |
Total Project Cost (US$m) | 76.30 |
The main objective of the project is to distribute efficiently and at a minimum cost the electricity generated by power stations located in the Mahaweli Basin to the principal load centers in and around Colombo. A secondary objective is to enable the existing system to function at acceptable levels of reliability, voltage control and energy losses.