Sri Lanka
| Borrower | Sri Lanka |
| Financing Type | Public Sector |
| Instrument | Project Loan |
| Focus Area | Energy |
| Approved | 27.11.1981 |
| Signed | 12.01.1982 |
| Status | Completed |
| Loan Administrator | IDA |
| Executing Agency | Ceylon Electricity Board (CEB) |
| Co-financiers | IDA, Government |
| OPEC Fund Contribution (US$m) | 11.00 |
| Total Project Cost (US$m) | 76.30 |
The main objective of the project is to distribute efficiently and at a minimum cost the electricity generated by power stations located in the Mahaweli Basin to the principal load centers in and around Colombo. A secondary objective is to enable the existing system to function at acceptable levels of reliability, voltage control and energy losses.