Lungga Hydropower Project
Solomon Islands
Borrower | Solomon Islands |
Financing Type | Public Sector |
Instrument | Project Loan |
Focus Area | Energy |
Approved | 28.01.1981 |
Signed | 30.04.1981 |
Status | Cancelled |
Loan Administrator | ADB |
Executing Agency | Ministry of Water and Public Utilities |
Co-financiers | ADB, IDA, CDC, ADAB, EIB, Government |
OPEC Fund Contribution (US$m) | 1.50 |
Total Project Cost (US$m) | 35.00 |
The project will comprise the first phase of development of the hydroelectric potential of the Lungga river at a site some 8 km from Honiara, and about 10 km upstream from the mouth of the river. The project components are: 1. Dam and Reservoir; 2. Power Station; 3. Sub-station and Transmission; 4. Miscellaneous Equipment; and 5. Consultancy Services and Training.