Kpong Hydroelectric Project
Ghana
Borrower | Ghana |
Financing Type | Public Sector |
Instrument | Project Loan |
Focus Area | Energy |
Approved | 23.03.1979 |
Signed | 18.05.1979 |
Status | Completed |
Loan Administrator | KFAED |
Executing Agency | Volta River Authority (VRA) |
Co-financiers | CIDA, IBRD, VRA, SFD, KFAED, BADEA, EDF, EIB, IDA |
OPEC Fund Contribution (US$m) | 3.70 |
Total Project Cost (US$m) | 243.30 |
The project aims at the provision of electrical power and has four main components: (a) the hydroelectric development of the Volta River at Kpong and associated transmission facilities; (b) reactive power compensation in VRA's transmission grid; (c) transmission lines and substations required to supply electric power to the Sefwi-Wiawso Bibiani area; and (d) a transmission line between Tema and Accra.