Kidatu Mufindi Power Transmission Project
Tanzania
Borrower | Tanzania |
Financing Type | Public Sector |
Instrument | Project Loan |
Focus Area | Energy |
Approved | 27.03.1980 |
Signed | 21.04.1980 |
Status | Completed |
Loan Administrator | AFDB |
Executing Agency | TANESCO |
Co-financiers | AFDB, CDC, TANESCO, Government, Inego investments |
OPEC Fund Contribution (US$m) | 5.00 |
Total Project Cost (US$m) | 67.28 |
The project consists of the following components:
- construction of 320 km of 220 kV transmission lines between Kidatu and Mufindi via Iringa;
- extension of the Kidatu sub-station and distribution network;
- construction of two 220 kV sub-stations at Iringa and Mufindi and installation of related equipment, including power line equipment;
- installation of about 550 km of distribution lines connecting sub-stations to their load centres; and
- supervision and engineering.