- Hirgigo Thermal Power Plant Project
Hirgigo Thermal Power Plant Project
Eritrea
Borrower | Eritrea |
Financing Type | Public Sector |
Instrument | Project Loan |
Focus Area | Energy |
Approved | 07.12.1995 |
Signed | 16.07.1996 |
Status | Completed |
Loan Administrator | KFAED |
Executing Agency | Eritrea Electricity Authority |
Co-financiers | SFD, KFAED, ABUDF, BADEA, Italian Gov't, Chinese Gov't, Government |
OPEC Fund Contribution (US$m) | 5.00 |
Total Project Cost (US$m) | 160.35 |
The primary objective of this project was to help the country expand its electricity capacity and overcome frequent power shortages by constructing a power station with four slow-speed diesel generators located 10 km from Massawa. Some 225-km of transmission lines were installed and four substations constructed.