Gueckedou-Seredou Road Project
Guinea
| Borrower | Guinea |
| Financing Type | Public Sector |
| Instrument | Project Loan |
| Focus Area | Transportation |
| Approved | 01.11.1983 |
| Signed | 12.03.1984 |
| Status | Completed |
| Loan Administrator | ISDB |
| Executing Agency | Ministère de l'Infrastructure et des Grands Aménagements |
| Co-financiers | SFD, KFAED, ABUDF, ISDB, Government |
| OPEC Fund Contribution (US$m) | 5.00 |
| Total Project Cost (US$m) | 96.20 |
The project represents the first phase of a programme to update the Gueckedou-Tuo earth road to an all-weather paved road. The project covers the section between Gueckedou and Seredou and consists of: (a) road construction over 132 km including 754 culverts, 25 bridges and pavement of the 6 m road; and (b) engineering and supervision, including assignment to the project of four expatriate engineers assisted by three technicians and two nationals of Guinea.