Geothermal Pre-feasibility Studies Project
Guatemala
| Borrower | Guatemala |
| Financing Type | Public Sector |
| Instrument | Project Loan |
| Focus Area | Energy |
| Approved | 25.05.1983 |
| Signed | 07.07.1983 |
| Status | Completed |
| Loan Administrator | OLADE |
| Executing Agency | Instituto Nacional de Electrificacion (INDE) |
| Co-financiers | OLADE, Government |
| OPEC Fund Contribution (US$m) | 1.10 |
| Total Project Cost (US$m) | 1.85 |
The project consists of the preparation of a pre-feasibility study for the development of the geothermal potential of the Amatitlan field. It includes the following major components:
- carrying out of professional and geophysical services;
- exploratory drilling equipment and materials, and other drilling equipment;
- laboratory services;
- civil works;
- technical analysis and other equipment;
- technical assistance coordination.