Energy Production and Distribution Project
Thailand
Borrower | Thailand |
Financing Type | Public Sector |
Instrument | Project Loan |
Focus Area | Energy |
Approved | 02.11.1982 |
Signed | 24.01.1983 |
Status | Completed |
Loan Administrator | IBRD |
Executing Agency | Petroleum Authority of Thailand (PTT) |
Co-financiers | IBRD, Export Credit, OECF, Commercial Sources, Government, Other |
OPEC Fund Contribution (US$m) | 15.00 |
Total Project Cost (US$m) | 455.00 |
The main objectives of the projct are to separate ethane and heavier hydrocarbon from the gas and then market these products. The main components are the following: (i) a gas separation plant to recover ethane, propane, LPG and natural gasoline. The liquid hydrocarbon (propane, LPG and natural gasoline) will be transported to the Laem Chabang terminal; (ii) bulk storage and distribution installations to distribute propane and LPG in the domestic market; and (iii) studies and technical assistance relating to LPG marketing, petroleum sector investments, energy policy and other aspects of PTT.