Electric Power Distribution Network Project
Mauritania
| Borrower | Mauritania |
| Financing Type | Public Sector |
| Instrument | Project Loan |
| Focus Area | Energy |
| Approved | 29.08.1989 |
| Signed | 24.10.1989 |
| Status | Completed |
| Loan Administrator | OPEC Fund |
| Executing Agency | SONELEC (National Water & Electricity Company) |
| Co-financiers | Government |
| OPEC Fund Contribution (US$m) | 2.50 |
| Total Project Cost (US$m) | 3.64 |
The project aims at the erection of power distribution networks incl. construction of pole foundation, mounting of poles, stringing of conductors, construction of the sub-station slab base and installation of prefabricated equipment and mounting and connection of new metering equipment, relocation of old meters and refurbishing of connections in the areas to be rehabilitated.