We use Cookies. Read our Terms
- Operations
- Dushanbe-Kyrgyz Border Road Rehabilitation Project (Phase I)
Dushanbe-Kyrgyz Border Road Rehabilitation Project (Phase I)
Tajikistan
| Borrower | Tajikistan |
| Financing Type | Public Sector |
| Instrument | Project Loan |
| Focus Area | Transportation |
| Approved | 02.12.2003 |
| Signed | 02.09.2004 |
| Status | Completed |
| Loan Administrator | ADB |
| Executing Agency | The Ministry of Transportation |
| Co-financiers | ADB, Government |
| OPEC Fund Contribution (US$m) | 6.00 |
| Total Project Cost (US$m) | 29.50 |
Tajikistan’s important highway which links the capital Dushanbe to Darband on the Kyrgyz border has deteriorated substantially. The project will therefore conduct the following:
- rehabilitation of approximately 150 km of the two-lane highway;
- repair and strengthening of embankments;
- installation of bridge protection structures against avalanches and landslides;
- installation of drainage systems and road safety features;
- improvedment of around 77 km of rural feeder roads.