Construction of Sikalbaha 225 MW Dual Fuel Combined Cycle Power Plant Project
Bangladesh
| Borrower | Bangladesh |
| Financing Type | Public Sector |
| Instrument | Project Loan |
| Focus Area | Energy |
| Approved | 21.12.2011 |
| Signed | 09.07.2012 |
| Status | Completed |
| Loan Administrator | KFAED |
| Executing Agency | Bangladesh Power Development Board (BPDB) |
| Co-financiers | SFD, KFAED, Government, ADFD |
| OPEC Fund Contribution (US$m) | 30.00 |
| Total Project Cost (US$m) | 282.50 |
To improve electricity access, reliability, and quality of supply to consumers in the greater Chittagong area, as well as increase the electric generation capacity of the country.
- supply, installation and commissioning of two dual fuel gas turbines, a 75MW boiler, desalination plant and other equipment with a combined capacity of 225 MW
- connection of the power plant to the national grid
- design, engineering and supervisory services, as well as PIU support