Bakra River Flood Protection and Chanda-Mohana Irrigation Project
Nepal
| Borrower | Nepal |
| Financing Type | Public Sector |
| Instrument | Project Loan |
| Focus Area | Agriculture |
| Approved | 13.06.1995 |
| Signed | 23.10.1995 |
| Status | Completed |
| Loan Administrator | OPEC Fund |
| Executing Agency | Ministry of Water, Power and Irrigation |
| Co-financiers | Government |
| OPEC Fund Contribution (US$m) | 8.50 |
| Total Project Cost (US$m) | 9.50 |
The aim of this project was twofold: to implement flood protection measures along the Bakra River and to rehabilitate the Chanda-Mohana Irrigation System. The former was realized by strengthening spurs and embankments and carrying out bio-engineering works using trees and grass. The latter involved the construction of a replacement concrete and steel weir and the rehabilitation of a number of canals.