We use Cookies. Read our Terms
- Operations
- Sirdarya 1,500MW combined-cycle gas turbine (CCGT) Power Plant
Sirdarya 1,500MW combined-cycle gas turbine (CCGT) Power Plant
Uzbekistan
Borrower | ACWA Power Sirdarya LLC |
Financing Type | Private Sector & Trade Finance |
Instrument | Private Sector Debt |
Focus Area | Energy |
Approved | 25.02.2021 |
Signed | 02.03.2021 |
Status | Completed |
Loan Administrator | OPEC Fund |
Co-financiers | EBRD, DEG, SCB, AIIB, NSA, SOCIETE, BOC, China Construction , Sirdarya |
OPEC Fund Contribution (US$m) | 50.00 |
The loan agreement with ACWA Power to support the construction and operation of a 1.5 GW combined cycle gas-turbine power plant in Sirdarya, Uzbekistan. The new plant, located near the border with Tajikistan, will replace an ageing, less efficient thermal power facility, resulting in lower operating costs and a significant reduction in GHG emissions.