This project aims at improving basic sanitary conditions in the Panama City and Bay Region, encompassing an area of around 21,000 ha. Works to be carried out include:
- construction and rehabilitation of collector systems, including sewer interconnections and pipelines
- rehabilitation of an existing pumping station
- engineering and design services
- installation of connections to the main receptor system