We use Cookies. Read our Terms
- Operations
- Neelum Jhelum Hydropower Plant Project
Neelum Jhelum Hydropower Plant Project
Pakistan
| Borrower | Pakistan |
| Financing Type | Public Sector |
| Instrument | Project Loan |
| Focus Area | Energy |
| Approved | 17.06.2009 |
| Signed | 23.03.2010 |
| Status | Completed |
| Loan Administrator | ISDB |
| Executing Agency | Water and Power Development Authority (WAPDA) |
| Co-financiers | SFD, KFAED, ADF, Government, ISDB |
| OPEC Fund Contribution (US$m) | 31.10 |
| Total Project Cost (US$m) | 1,646.32 |
Electricity consumption in Pakistan has risen considerably over the past five years. However, transmission and distribution losses are high, leading to widespread blackouts. Presently, only around 60% of the population is connected to the national grid. The project will thus carry out the following activities:
- construction of a 969 MW hydropower plant in Muzaffarad District, which is situated on the banks of the Jhelum and Neelum rivers in the north; and
- construction of a tunnel, a diversion weir and concrete gravity dam.