Mutsamudu Port Project
Comoros
| Borrower | Comoros |
| Financing Type | Public Sector |
| Instrument | Project Loan |
| Focus Area | Transportation |
| Approved | 06.04.1982 |
| Signed | 21.05.1982 |
| Status | Completed |
| Loan Administrator | ISDB |
| Executing Agency | Ministry of Equipment and Environment |
| Co-financiers | AFDB, KFAED, BADEA, ISDB, ABUDF, < Not known > |
| OPEC Fund Contribution (US$m) | 2.00 |
| Total Project Cost (US$m) | 45.80 |
The project includes the enlargement of the existing jetty (175m x 8m) to the required dimensions (250m x 32m) for the berthing and adequate servicing of large vessels; the construction of a pier (80 x 25m) to accommodate coasters; the construction of 16.5 m2 hangars and a 25 m x 9m bridge over the river that flows into the port; and the purchase of two tugs and handling equipment.