Mumbai Metro Line 5 Project (cost sharing contribution)
Financing Type | Grants |
Category | Technical Assistance |
Focus Area | Transportation |
Approved | 29.04.2024 |
Loan Administrator | OPEC Fund for International Development |
Organization | AIIB |
OPEC Fund Contribution (US$m) | 0.30 |
Total Project Cost (USDm) | 0.30 |
The proposed project entails the construction and equipment for the 12.7 km western section of Mumbai Metro Line 5 (MML5) between Kapurbawadi (in Thane) and Dhamankar Naka (in Bhiwandi). MML5 is an elevated metro rail and will have its own train depot for operation, storage and maintenance. The grant is a cost sharing contribution for the implementation of the Project (Loan 15826). The project and the Grant were approved by motion on 29 April 2024 Package n°34 - Decision N° 2 (Q2-04-24).