- Godomey-Bohicon-Abomey Highway Project
Godomey-Bohicon-Abomey Highway Project
Benin
Borrower | Benin |
Financing Type | Public Sector |
Instrument | Project Loan |
Focus Area | Transportation |
Approved | 16.11.1977 |
Signed | 10.01.1978 |
Status | Completed |
Loan Administrator | KFAED |
Executing Agency | Ministry of Equipment |
Co-financiers | IDA, KFAED, Government |
OPEC Fund Contribution (US$m) | 1.60 |
Total Project Cost (US$m) | 21.30 |
The project aimed at the rehabilitation of existing roads in Benin, including: (a) rehabilitation of the Godomey-Bohicon-Abomey road (107 km); (b) resurfacing of about 195 km of bituminous roads; (c) resurfacing of about 459 km of laterite roads; (d) strengthening of the on-going routine maintenance programme; (e) technical assistance to the Directorate of Roads and Bridges in the Ministry of Equipment for further strengthening road maintenance planning and staff training; and (f) preinvestment study of the Ouidah-Allada road (40 km).