Abu Qir Power Plant Project
Egypt
| Borrower | Egypt |
| Financing Type | Public Sector |
| Instrument | Blend Facility |
| Focus Area | Energy |
| Approved | 16.12.2008 |
| Signed | 31.05.2009 |
| Status | Completed |
| Loan Administrator | OPEC Fund |
| Executing Agency | Egyptian Electric Holding Company (EEHC) |
| Co-financiers | ISDB, AFESD, KFAED, AFDB, Government, Local Banks |
| OPEC Fund Contribution (US$m) | 30.00 |
| Total Project Cost (US$m) | 1,559.80 |
The project will build an Abu Qir Power Plant located 33 km east of the port city of Alexandria, adjacent to the Abu Qir Steam Power Station.
- construction of a new power plant that will contain two steam-turbine generating units, each capable of delivering 650 MW of power, and two pressurized steam generators
- building of a desalination plant and wastewater treatment facility